Bidding for waterproof coating project of the hott

2022-09-22
  • Detail

Bidding for waterproof coating project of Xiangpu line of new railway

project introduction

1 Bidding conditions

the bidding project has been approved by the national development and Reform Commission for the approval of the national development and Reform Commission on the proposal for the new Xiangtang Putian railway project (fgjy [2006] No. 1693) and the Ministry of Railways for the approval of the preliminary design of the new Xiangtang Putian railway due to its special surface structure (Fuzhou). The construction funds have been implemented, and the project materials waterproof coating has met the bidding conditions, Public bidding is now under way

2. Project overview and bidding content

2.1 project overview:

the newly-built railway Xiangpu line is located in the eastern Jiangxi and central Fujian regions, starts from Nanchang City, Jiangxi Province in the west, leads out from Lehua east station (not included), passes through Fuzhou, Nancheng, Nanfeng, Fujian Jianning, Taining, Jiangle, Shaxian, Youxi Yongtai bifurcation, and is introduced to Fuzhou Station of Waifu railway and Putian station of Fuzhou Xiamen railway, with a total length of 631.4km; The total length of Jiangxi section is 244.6km, and that of Fujian section is 386.8km. The total investment is 51.8 billion yuan

2.2 bidding content: (see Annex)

2.3 bidding basis:

2.3.1 Bidding Law of the people's Republic of China

2.3.2. Measures for bidding and tendering of goods for engineering construction projects (Order No. 27) issued by seven ministries and commissions including the national development and Reform Commission

2.3.3. Measures for the management of materials and equipment for railway construction projects (TJs [2006] No. 83) issued by the Ministry of railways

2.3.4. Interim Measures for procurement and supply of materials and equipment supplied by Party A for railway construction projects (TJs [2006] No. 217) issued by the Ministry of railways

2.3.5. Catalogue of materials and equipment supplied by Party A for railway construction projects (TJH [2007] No. 199) issued by the Ministry of railways

2.3.6. Guiding opinions on the bidding of materials and equipment supplied and controlled by Party A for railway construction projects (TJs [2007] No. 495) issued by the Ministry of railways

Constant consistency

2.3.7 Minutes of the 39th meeting of the railway construction coordination group

2.3.8. Reply on the preliminary design of the new Xiangtang Putian (Fuzhou) railway (TJH [2008] No. 978) issued by the Ministry of railways

2.3.9. Reply on the bidding plan for the construction and supervision of civil engineering of Yongtai Putian section of Nanchang terminal of Xiangpu Railway (TJH [2008] No. 58)

2.3.10. The reply of the Ministry of Railways on the bidding plan for the construction and supervision of the Sanjiang Town Fuzhou section of the new Xiangpu Railway (TJH [2008] No. 985)

2.3.11. Letter of the Ministry of Railways on Approving the bidding plan for materials supplied by Party A for the new Sanjiang Town Fuzhou section of Xiangpu Railway (JG [2008] No. 159)

2.3.12. The project bidding Management Office of Shanghai Railway Bureau replied to the bidding plan for materials (waterproof paint) supplied by Party A for the Sanjiang Town Fuzhou section of the new Xiangpu Railway (Shangju Zhaoban [2011] No. 68)

basic information

bidding number shwz

source of funds self raised by the enterprise

place of implementation Jiangxi Nanchang

construction cycle in the development of new products, it is necessary to consider the design and process and materials themselves 2011 to 2012

qualification review methods prequalification

bidding scope new railway Xiangpu line project construction and management materials (waterproof coating)

note: the reprinted contents are clearly indicated, Reprint is for the purpose of transmitting more information, and does not mean agreeing with its views or confirming the authenticity of its content

Copyright © 2011 JIN SHI